DOWNTOWN MOLINE CENTRE

DOWNTOWN MOLINE CENTREDOWNTOWN MOLINE CENTREDOWNTOWN MOLINE CENTRE

DOWNTOWN MOLINE CENTRE

DOWNTOWN MOLINE CENTREDOWNTOWN MOLINE CENTREDOWNTOWN MOLINE CENTRE
  • HOME
  • EXPLORE
    • Map of Moline Centre
    • ATTRACTIONS
    • FOOD AND DRINK
    • HOTELS
    • SERVICES
    • SHOPPING
    • APARTMENTS & LOFTS
    • eATLAS ADVENTURES
    • GET AROUND
    • PARKING
    • POLLINATOR BEDS
  • EVENTS
    • EVENT CALENDAR
    • BASS STREET LANDING
    • SKINNER BLOCK COURTYARD
    • LIVE ENTERTAINMENT VENUES
  • ABOUT
    • MOLINE CENTRE PROGRAM
    • RENEW MOLINE, INC.
    • CITY OF MOLINE
    • FIND US ON FACEBOOK
    • CONTACT US
    • FRIENDS OF MOLINE CENTRE
  • PROJECTS
  • More
    • HOME
    • EXPLORE
      • Map of Moline Centre
      • ATTRACTIONS
      • FOOD AND DRINK
      • HOTELS
      • SERVICES
      • SHOPPING
      • APARTMENTS & LOFTS
      • eATLAS ADVENTURES
      • GET AROUND
      • PARKING
      • POLLINATOR BEDS
    • EVENTS
      • EVENT CALENDAR
      • BASS STREET LANDING
      • SKINNER BLOCK COURTYARD
      • LIVE ENTERTAINMENT VENUES
    • ABOUT
      • MOLINE CENTRE PROGRAM
      • RENEW MOLINE, INC.
      • CITY OF MOLINE
      • FIND US ON FACEBOOK
      • CONTACT US
      • FRIENDS OF MOLINE CENTRE
    • PROJECTS
  • HOME
  • EXPLORE
    • Map of Moline Centre
    • ATTRACTIONS
    • FOOD AND DRINK
    • HOTELS
    • SERVICES
    • SHOPPING
    • APARTMENTS & LOFTS
    • eATLAS ADVENTURES
    • GET AROUND
    • PARKING
    • POLLINATOR BEDS
  • EVENTS
    • EVENT CALENDAR
    • BASS STREET LANDING
    • SKINNER BLOCK COURTYARD
    • LIVE ENTERTAINMENT VENUES
  • ABOUT
    • MOLINE CENTRE PROGRAM
    • RENEW MOLINE, INC.
    • CITY OF MOLINE
    • FIND US ON FACEBOOK
    • CONTACT US
    • FRIENDS OF MOLINE CENTRE
  • PROJECTS

ARSENAL VIADUCT PROJECT

PROJECT MAP

A pdf of this map can be downloaded below.

Start date: September 2, 2025

Anticipated completion date: August 2027

Estimated cost: $12 million


PURPOSE & DESCRIPTION

 The purpose of the Rock Island Arsenal Viaduct reconstruction project is to provide the needed replacement of the current bridge deck, parapets, and lighting as well as spot repairs to the steel support beams. The condition of the existing bridge has deteriorated to the point where an upgrade to those elements is necessary.


The 16th Street Viaduct Bridge intercepts 4th Avenue and 14th Street at street level and passes over existing streets and businesses to its connection with the Arsenal Island Bridge just north of River Drive. The bridge provides direct access for commuters wishing to travel between Arsenal Island and Moline. Weather, salt used in snow removal, vehicle use, and age have combined to result in deterioration of the bridge deck and the need for repairs.


A pdf with more information about the project's purpose and description can be downloaded below.

PROJECT SUMMARY

  • Project start date: September 2, 2025
  • Completion date: August 2027
  • The Arsenal on-ramp and off-ramp at River Drive WILL ALWAYS BE OPEN during the project.
  • The Arsenal on-ramp on 14th Street and the Arsenal off-ramp on 4th Ave WILL ALWAYS BE CLOSED during the project.
  • River Drive and 4th Avenue WILL NOT BE CLOSED AT THE SAME TIME - when one is CLOSED to traffic, the other will be OPEN.


PROJECT TIMELINE (updated 8/6/25)

  • Project staging work begins 9/2/25
  • Arsenal viaduct between River Drive and 14th St/4th Ave will CLOSE 9/8/25 - on-ramp and off-ramp at River Drive will remain OPEN.
  • Stage 1 of bridge span demolition starts 10/27/25 - River Drive will be CLOSED but 4th Ave will be OPEN.
  • Winter shutdown: 12/19/25 to 2/27/26 - River Drive and 4th Ave will be OPEN during winter shutdown.  NOTE: Some work will be done during winter shutdown, but it will not require road closures
  • Stage 1 resumes 2/27/26 - River Drive will be CLOSED until 6/10/26
  • Stage 2-4 bridge demolition work begins 6/11/26 - 4th Ave and its 15th Street intersection will be CLOSED but River Drive will be OPEN.
  • Winter shutdown: 12/7/26 to 3/5/27 - 4th Ave and River Drive will be OPEN.
  • Project resumes 3/8/27 - River Drive will be CLOSED.
  • 5/3/27 - River Drive RE-OPENS.
  • 5/4/27 - 4th Ave and its intersection at 15th Street will be CLOSED until the project is finished on 8/23/27.

DOWNLOADS

Project Map - August 2025 (pdf)Download
Lot N Project Map - 8-7-25 (pdf)Download
Lot U Project Map - 8-7-25 (pdf)Download

7th AVENUE RECONSTRUCTION

7th Avenue in Moline is under construction in 2025.

Phase I - 15th Street to 16th Street 

Start date: May 5, 2025

Anticipated completion date: August 30, 2025

The photo at left shows road closures for Phase I of this project.

Phase II - 16th Street to 19th Street

Anticipated start date: September 2, 2025

Intersections at 17th and 18th Streets will be closed during Phase II

Anticipated end date: Fall 2025

Single-lane roundabouts will be installed at 15th St and 18th St

PDF's of this map, preliminary design work for this project, and FAQs about this project are available for download below.

DOWNLOADS

7th Avenue Project Road Closures - Phase 1 (pdf)Download
7th Avenue Reconstruction Renderings - Moline Centre (pdf)Download
7th Avenue Reconstruction FAQs (pdf)Download
  • RAMP UPDATES

Moline Centre Program - Renew Moline, Inc.

1506 River Drive, Moline, Illinois 61265

kmarske@renewmoline.com (309) 762-9190

Copyright © 2025 Moline Centre - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept